spaces

interior

project

furniture

texture

color

Choose your interior design project

| DISTINCT DESIGN |

  • Comfortable and diverse

  • Customized solutions

  • Maximum efficiency

Väikese korteri elutoa sisekujundus

INTERIOR DESIGN PROJECTS

Services

New interior changes the mood

3D INTERIOR DESIGN PROJECT FOR 1 ROOM OR STUDIO 40 SQ.M.  |PLAN, MOODBOARD +VISUALIZATION , SHOPPING LIST|

3D interior design project allows you to see the design for 1 room. The project includes realistic  2 3D photos 2k resolution, moodboard, shopping list and a 2D floorplan with all details.

Project lead time is 7 working days.

240€
  • Furniture layout.

  • 3D visualization of the space (2 style options)./ Foto.

  • Finishing materials specification.

  • Lights specification.

  • Furniture specification.

3D INTERIOR DESIGN PROJECT FOR 2 ROOM OR SMALL APARTMENT 60 SQ.M.  |PLAN, MOODBOARD +VISUALIZATION , SHOPPING LIST|

3D interior design project allows you to see the design for 2 room. The project includes realistic  4 3D photos 2k resolution, moodboard, shopping list and a 2D floorplan with all details.

Project lead time is 10 working days.

360€
  • Furniture layout.

  • 3D visualization of the space (2 style options)./ Foto.

  • Finishing materials specification.

  • Lights specification.

  • Furniture specification.

3D INTERIOR DESIGN PROJECT FOR 3 ROOM OR APARTMENT 100 SQ.M.  |PLAN, MOODBOARD +VISUALIZATION , SHOPPING LIST|

3D interior design project allows you to see the design for 1 room. The project includes realistic 6 3D photos 2k resolution, moodboard, shopping list and a 2D floorplan with all details.

Project lead time is 15 working days.

480€
  • Furniture layout.

  • 3D visualization of the space (2 style options)./ Foto.

  • Finishing materials specification.

  • Lights specification.

  • Furniture specification.

Order 3D Design Project

INTERIOR DESIGN PROJECT |PRELIMINARY STAGE|

A preliminary interior design project will help you get an idea of the planning solutions for the placement of furniture filling, lamps, sockets and switches, the preliminary location of the ceiling decor, as well as wall and floor finishing materials.

Project lead time from 21 working days.

25  € per m²
  • Planning solution. / Furniture layout.

  • 3D visualization of the space (2 style options)./ Foto.

  • Switches and lighting equipment layout .

  • Sockets and other electrical equipment layout .

  • Ceiling layout .

  • Floor covering plan.

  • Wall finishing plan.

  • Coloristic solution of the spatial decor.

  • Finishing materials specification.

  • Lights specification.

  • Furniture specification.

Order Preliminary stage design project

INTERIOR DESIGN PROJECT | WORK PROJECT STAGE|

This set of interior design projects allows you to understand the planning solution in detail. Includes drawings, views and sections, specifications and design details. Realistic 3D photos allow you to see the future space as a whole.

Project completion time from 1.5 months.

55 € per m²
  • Furniture plan .

  • 3D visualization of the space (2 style options).

  • Switches and lighting equipment layout .

  • Sockets and other electrical equipment layout .

  • Ceiling layout .

  • Floor covering plan.

  • Wall finishing plan.

  • Views along the walls of the premises.

  • Finishing materials specification.

  • Lighting specification.

  • Fixtures specification

  • Door specification

  • Coloristic solution of the spatial decor.

  • Album of technical solutions. Details.

  • Customized furniture solutions.

  • Consultations at a construction site (up to 10 hours. For Estonia only).

Order
Sample project

Stages of development of an interior design project

1

Customer profile.

Conclusion of a contract.

Departure of the designer for measurement within Tallinn and Harju County.

Self-measurement if you are far away.

2

Development of 3-4 options for arranging furniture

The planning solution includes:
01.1 Measurement plan
01.2 Dismantling and installation plan
01.3 Furniture layout plan
01.4 Furniture arrangement plan with dimensions

3

Development of 3D visualizations.
Compilation of collages with the selection of materials and furniture for each room and preparation of photorealistic renderings of each room.

4

Development of a documentation package
Section 01
01.5 Floor plan
01.6 Fixtures plan
01.7 Door plan
01.8 Ceiling plan
01.9 Plan of types of finishes
Section 02
02.1 Layout of outlets and other electrical equipment.
02.2 Layout of switches with reference to the lighting of the switching group
02.3 Lighting plan
Section 03
03.1 Views along the walls of the premises.
03.2 Views of an tiles on the walls of the bathrooms

5

Development of supporting documentation for Section 04.
Sheets, specifications, etc. indicating manufacturers, sellers and volumes.

Development of individual technical solutions,
custom furniture items: Section 06.

6

Designer supervision over the implementation of the project.